Multi-Nip Precision
Three independently regulated gaps for controlled dry film formation, densification, and lamination.
Laboratory Machines
Laboratory Calender GK 300 L 6R for Dry Battery Electrode TechnologiesEngineered for dry electrode precision - from powder to laminated film
The GK 300 L 6R replicates multi-stage industrial calendering for dry battery electrode R&D. Its precision-controlled roller system and modular process configuration allow researchers to simulate full production workflows with exceptional flexibility and technical accuracy.
The 6-roll calender supports two distinct operating modes:
Our modular calender system features a three-gap configuration that enables complete process validation across all critical stages of film development.
In the first gap, dry film formation is achieved under precisely controlled conditions. The second gap allows for compaction or densification, ensuring structural stability and optimized mechanical properties. In the third gap, single- or double-sided lamination or film finalization is carried out to achieve the desired surface characteristics.
With independent gap control at each stage, this configuration enables full-process validation of pressure, film thickness, and mechanical integrity.
With integrated unwinder/rewinder systems, in-line IR preheating, edge trimming, gap measurement, and a dedicated control panel, the GK 300 L 6R enables accurate testing of binder-free formulations, dry powders, and sensitive film laminations. The modular system can be reconfigured to match your evolving testing protocols.
Technical Specifications
Roll Width
300 mm
Roller Diameter
200 mm
Max Line Speed
up to 5 m/min
Compression Force
Up to 15 tons
Gap Accuracy
± 2 µm
Roller Temperature
150 °C (optional: up to 200 °C)
Operation
Touch panel with PLC
Feeding System
Web, film, or dry powder via hopper
IR heating fields (optional)
Dual carbon-tube arrays, PLC-controlled
Thickness Measurement (optional)
LED micrometer ±1 µm accuracy
To meet the evolving demands of dry battery electrode development, the GK 300 L 6R is designed with a modular architecture that allows full customization of process parameters, web handling, and in-line control systems. Whether you’re optimizing film compaction, evaluating lamination temperatures, or testing sensitive dry powder formulations, the following components and configurations enable you to build a system that aligns precisely with your research objectives.
Optional remote service interface enables online support, diagnostics, and updates by our engineers via secure GSM or LAN connection.
Hydraulically regulated gap control system ensures accurate pressure distribution and micrometer-level gap control across all three nips. Live digital feedback supports continuous process optimization.
Manual crush cutters enable precise edge trimming, while integrated doctor blade systems ensure clean, residue-free roller surfaces during processing.
Each roller includes integrated electrical cartridges for temperature regulation to 150 °C, with optional upgrade to 200 °C for special materials. Control is managed through a mobile panel with ±1 °C accuracy.
Unwinder and rewinder support up to 300 mm material width and 250 mm diameter, with options for geared motor drive, servo-assisted tensioning, and web edge control.
Dual infrared heating fields precondition the web prior to lamination. Group or continuous adjustment via PLC ensures uniform energy distribution across both sides.
Each roll stage can be tuned for gap distance, pressure, temperature, and compaction level — giving full control over each step in the dry electrode process.
Three-point thickness measurement via LED micrometer and temperature-compensated sensor ensures dimensional accuracy with ±2 µm tolerance.
True to scale and within minutes
Every battery project is unique — your lab setup should be, too. Define your ideal GK 300 L 6R system using our intuitive configurator. Select materials, process steps, heating zones, and roller specs to match your specific needs.
Development Center
Our Development Center is equipped with the GK 300 L 6R and dedicated drying rooms, allowing you to simulate full dry electrode workflows. Conduct trials with real-time support from our process experts in a controlled, climate-regulated environment.
Modular equipment setups and real-time data tracking provide everything you need to validate materials and processes with production relevance. Our engineers help translate your test results into real-world outcomes — faster and with confidence.